Mining Superintendent

Please provide your full name
1. BI-03P.02 Lighting, delineation and signs are installed and maintained to standards that meet minimum site road design requirements
Site road design sets minimum standards for the installation, inspection and maintenance of lighting, delineation and signs that assist vehicle operators maintain situational awareness.

Is the expectation of this Business Input relevant in your circumstances?
If No to question 1 above please provide details
Why doesn't BI-03P.02 expectation not apply?
1.1 Specification
Please provide details of where the specification can be found. Provide specific references, that is text which requires this Business Input - not just a document name.

Designs and construction requirements include standards for lighting of high traffic areas (e.g. around the mine infrastructure areas, dump edges, intersections, etc.) and signs to alert vehicle operators of road network requirements. 

Survey mark out requirements for road network infrastructure to meet site requirements. 
1.2 Implement
Describe how the Business Input is implemented. Is it adequate, consistent, reliable, and repeatable? Do people know what is expected of them?

Road construction crews place and maintain required permanent and temporary lighting, communication / information signage around the road network. 
1.3 Monitor
Please provide details of how the status of the Business Input is monitored. 

Survey regularly mark out and pick up locations of required elements of the surface and underground roadway networks - updating design and as-built plans as required.
1.4 List relevant documents
Please list all relevant documents here.
1.5 Attach relevant documents
Please attach relevant documents here.

Note : Please do not Submit until the Uploaded Successfully alert pops up.

2. BI-03S.05 Infrastructure protection - placement of barriers and/or warning devices to prevent unwanted vehicle interactions - Expectation

Site infrastructure is protected from unplanned contact with mobile equipment.

Is the expectation of this Business Input relevant in your circumstances?

If No to question 2 above please provide details
Why doesn't BI-03S.05 expectation not apply?
2.1 - Specification
Please provide details of where the specification can be found. Provide specific references, that is text which requires this Business Input - not just a document name.

When constructing roads near infrastructure, hazardous locations or work areas the documented requirements include placing windrows, bunds or physical barriers (designed to reduce injury threats if struck (i.e. rounded and/or frangible)) - and where these cannot be placed (e.g. for overhead lines) then warning devices (over height alarms, cable balls, geo fencing etc.), or vision enhancing components (mirrors, translucent ventilation curtains etc.) are installed. 

2.2 - Implement
Describe how the Business Input is implemented. Is it adequate, consistent, reliable, and repeatable? Do people know what is expected of them?

Barriers and warning devices that protect site infrastructure from contact with mobile equipment are installed as designed. 
Protection types include physical barriers that prevent contact through to warning/vision enhancing devices to enhance vehicle operator's situational awareness. 
2.3 - Monitor
Please provide details of how the status of the Business Input is monitored. 

Requirements for inspection, work area standards and peer review of conformance with design protocols could be identified.
2.4 - List relevant documents
Please list all documents here.
2.5 - Attach relevant documents
Please attach documents here.

Note : Please do not Submit until the Uploaded Successfully alert pops up.

Read More

UWJV VICE Mapping Questions for Human Resources Manager

Read More

UWJV VICI Mapping Questions for Manager Mining/Operations

Read More

UWJV VICE Mapping Questions for Mechanical Engineer

Read More

UWJV VICI Mapping Questions for Mining Manager

Please provide your full name
BI-05D.09 Change Management Process - Expectation
Applied and effective change management processes are in use at the operating site.

Is the expectation of this Business Input relevant in your circumstances?
If No to question above please provide details
Why doesn't BI-05D.09 expectation not apply?
Specification

Please provide details of where the specification can be found. Provide specific references, that is text which requires this Business Input - not just a document name.

New equipment, road network, traffic flow adjustments etc. follow a defined change management process that: 

  • Confirms the scope 
  • Identifies potential impacts for mobile equipment and personnel 
  • Confirms how hazards will be controlled e.g. signs, barriers, etc. 
  • Communicates relevant information to personnel 
Implement

Describe how the Business Input is implemented. Is it adequate, consistent, reliable, and repeatable? Do people know what is expected of them?

The process is applied when introducing new equipment and new processes.
Superintendents or Supervisors apply the process when there is a need make significant operational changes e.g. in the road network or traffic flows. 

Monitor
Please provide details of how the status of the Business Input is monitored.

This could include the frequency of oversight provided for change management, change completion reviews/reports and system audit requirements.
List relevant documents
Please list relevant documents here.
Attach relevant documents
Please attach relevant documents here.

Note : Please do not Submit until the Uploaded Successfully alert pops up.

Read More

UWJV VICE Mapping Questions for Contracts Superintendent

Please provide your full name
BI-05D.03 Effective contractor management processes
Site contractor management processes are effective. 

How do we currently meet this expectations? 
If No to question above please provide details
Specification

Please provide details of where the specification can be found. Provide specific references not just a document name.

Site contractor management processes are effective, and they include:

  • Mobilisation information
  • Access and induction information
  • Allocation of facilities e.g. workshops, parking, offices, equipment laydown, operating areas etc.
  • Equipment minimum standards e.g. vehicle markings and lighting requirements
Traffic management and other operational interfaces
Implementation

Describe how the Business Input is implemented. Is it adequate, consistent, reliable, and repeatable? Do people know what is expected of them?

Nominated contract superintendents provide contractor information on site requirements.

Contract superintendents provide oversight and instructions to contractors.
Monitor
Please provide details of how the status of the Business Input is monitored.
List relevant documents
Attach relevant documents

Note : Please do not Submit until the Uploaded Successfully alert pops up.

Read More

UWJV VICE Mapping Questions for Reliability Engineer

Read More

UWJV VICE Mapping Questions for Electrical Engineer

Read More